Educating Yourself About No Stitch Cataract Surgery

byadmin

According to the American Academy of Ophthalmology about 22 million people in the United States over the age of 40 have cataracts. About half of all people over the age of 80 have this condition that clouds the lens of the eye and progressively leads to a decrease in vision. With the only cure found in cataract surgery, learning more about cataracts and their treatment can help you to answer questions for family members.

First, it is important to realize that despite the claims of some supplement manufacturers, there is no scientific evidence that any supplements can reduce the risk of developing cataracts. There is also no treatment except for cataract surgery at this time, but the type of surgery has changed dramatically providing patients with options for very fast healing with reduced risk of complications.

No-Stitch Surgery

Now, most cataract surgery is classified as “no-stitch surgery” because the entire process is done using an extremely fine tube that is inserted into the eye. This tube contains an ultrasound instrument that creates a safe vibration in the eye that breaks up the cataract into small pieces.

The pieces of the cataract are gently suctioned out of the eye and an artificial lens put in place. When the tube is removed the eye tissue simply seals over, without the need for any type of stitches. This entire process is actually known as phacoemulsification and has an extremely high success rate with very few complications.

Local Anesthesia Only

The entire process of no-stitch cataract surgery is done under local anesthesia on an outpatient basis. This anesthesia of the eye is usually done with drops, meaning no injections for those that are a bit nervous about the idea of a needle.

Patients typically do not require patching of the eye and there is minimal healing time required. Some patients, but not all, may experience mild discomfort in the eye for a day or two after the procedure. Most people do not need to drastically change their typical lifestyle during the healing process which can last up to eight weeks.

The benefits of no-stitch cataract surgery make this a good option for a wide range of different patients. You and your doctor can discuss the options, any possible risks, and any concerns that you may have before you decide if this is the right choice for your eye health.

City of Calgary, Canada removes fluoride from drinking water

Thursday, February 10, 2011

Calgary city council voted 10 to 3 on Wednesday to stop fluoridating their water supply. This overturns a previous plebiscite from 1989 to add the fluoride in an attempt to reduce tooth decay.

Opponents of water fluoridation claim that there could be unknown health effects of fluoride, and question its effectiveness in preventing tooth decay. They also claim that individuals should be able to decide for themselves whether or not to use fluoride. However, Alberta Health Services maintains that current evidence shows that fluoride is both safe, and beneficial to dental health.

It is estimated that no longer fluoridating the water supply could save Calgary’s city council C$750 thousand (€550 thousand) annually, as well as cutting a C$6 million (€4.3 million) upgrade to the fluoridation system.

Retrieved from “https://en.wikinews.org/w/index.php?title=City_of_Calgary,_Canada_removes_fluoride_from_drinking_water&oldid=1180425”

We’ll always have .paris: ICANN votes for top level domain registration in 2009

Tuesday, June 24, 2008

The Internet Corporation for Assigned Names and Numbers (ICANN), a non-profit organisation based in California, United States to regulate internet domain names, will vote on Thursday for a proposal to allow the open registration of top-level domains (TLDs) for Internet addresses. If the proposal succeeds, then as soon as next year any entity with sufficient funds may be able to apply for ownership of a relevant TLD, so that, for example, web sites could have addresses ending in .paris, .ebay or .love.

The range of TLDs has traditionally been heavily restricted by ICANN, with most being country codes (such as .uk for the United Kingdom, or .jp for Japan) or related to the purpose of a website (like .com for commercial websites, .edu for educational sites, and .org for non-profit organisations).

Some existing owners of TLDs have already set up arrangements that have made use of their flexibility – for example, the countries of Tuvalu and the Federated States of Micronesia have leased many domains on their country code TLDs (.tv and .fm respectively) to entertainment websites based on the association with “television” and “FM radio”.

Commentators have pointed out that this may open the way for the controversial .xxx domain, proposed for sites with adult content, which ICANN has previously rejected. Its existence will not be guaranteed in the new system, however, as domain registration will be subject to an independent arbitration process, and granted only when the registrant can demonstrate “a business plan and technical capability”, and applications may be rejected on “morality or public order” grounds. While the proposal does not include registration fees, the TLDs are predicted to cost several thousand dollars, at least.

ICANN CEO Paul Twomey, speaking with the BBC, compared the opening of domains to the opening of real estate in the United States in the 19th century. “It’s a massive increase in the geography of the real estate of the Internet,” he said.

The ICANN International Public Meeting, which opened in Paris, France on Monday, includes workshops and public forums as well as the ICANN Board meeting.

Retrieved from “https://en.wikinews.org/w/index.php?title=We%27ll_always_have_.paris:_ICANN_votes_for_top_level_domain_registration_in_2009&oldid=4511639”

School bus crash kills one student in Georgia, US

Monday, October 4, 2010

A school bus, with fourteen students from the Temple High School aboard, crashed in Georgia, United States, earlier today on Georgia State Route 113 going southbound, killing one student and leaving a dozen more injured. It is reported that at the time of the crash there was a trainee driving the bus.

According to the Carroll County Schools Superintendent, one student was killed and a dozen others were in need of medical care after the bus rolled over. A spokesman for the mayor and a highway patrolman also confirmed that a student died. The student has been identified as James Rashawn Walker of Temple, Georgia. It is reported that the bus was heading southbound on the highway when the driver lost control and drove into a ditch, which caused the bus to turn over.

Witnesses reported the bus flipped multiple times before coming to a halt. According to a witness, Ben Cole, a lot of the students were crying and in pain. The six injured were taken to the Tanner Medical Center and the Higgins Hospital, among them was the 45-year-old female bus driver. The Carrol County Sheriff’s Department are advising concerned parents to gather at Temple High School.

Retrieved from “https://en.wikinews.org/w/index.php?title=School_bus_crash_kills_one_student_in_Georgia,_US&oldid=1676856”

Kids For Modeling And Models Young}

Kids for modeling and models young

by

[youtube]http://www.youtube.com/watch?v=8DVkNWANQFk[/youtube]

Ckint Jhonson

Do you want to get your child into modeling? Many parents dream of getting their children into the world of modeling but do not know where to begin. Ironically, the demand is higher than ever for models young. One way that parents can get their children into modeling and have them earn at the same time is to join an online modeling agency. Online modeling agencies are not like off line agencies and are easier to get into. Parents who feel that their children are cute enough to model can get them into the agency and start seeing them in ads that feature models young.

Kids for modeling are used all over the internet as well as off line. They usually begin in catalogs or as advertisements online. Proud parents can watch as their child models begin to get more confidence and learn how to present themselves before the camera. Models young enough to sell products like toys and child clothes are very much needed in the industry. The problem is that most parents have no idea how to get their children into modeling. Before a parent can get their child into modeling, they need to have photographs of them taken by a professional photographer. These will be used for the portfolio of the child. Kids for modeling have full portfolios that feature both head shots and full length shots. These portfolios are then put on the modeling agency site so that clients who are looking for models young can find them. Clients who are looking for kids for modeling usually want professional photos that they can see. They will also want children who can behave and model in front of the camera without getting cranky. If a child is cute and has a good disposition, chances are that he or she will get modeling jobs by clients who look to these online modeling agencies to provide them with kids for modeling. Parents can help out their child by looking at the jobs posted on the job boards for models young. They can also make sure that they add new photographs for modeling jobs on the portfolio. Generally, when it comes to kids for modeling, the more experience the child has in the field, the more in demand they are. By persisting and making sure that your child has their portfolio out there and looking for jobs for him or her, you will see that your child begins to get an increasing number of jobs for models young. This can be a fun thing for a younger child and may lead to a modeling career for a teen or adult.Models young

enough to model children clothes and pose with toys are in demand online and off.

Kids for modeling

are needed for many jobs. One way that a parent can get their kids into modeling is to join an online modeling agency such as Online Model World.

Article Source:

Kids for modeling and models young}

US president Obama, Congress call for blocking of executive bonuses at AIG insurance company

Wednesday, March 18, 2009

United States President Barack Obama stated Monday that insurance giant AIG is in financial trouble due to “recklessness and greed,” and called for legal action to stop the company from giving out millions of dollars in bonuses to its executives.

“It’s hard to understand how derivative traders at AIG warranted any bonuses, much less $165 million in extra pay,” Obama said. “How do they justify this outrage to the taxpayers who are keeping the company afloat.”

Obama’s statement comes after reports surfaced last weekend saying the insurance agency, which is in deep financial trouble, had paid US$165 million to executives in bonuses, after receiving $170 billion as part of a government bailout plan.

AIG has said that the bonuses have to be given out, as the company is legally required by contract to do so. A representative with the National Economic Council, Lawrence H. Summers, also said that the bonuses were required to be given out. If AIG had refused to give out the bonuses, employees could file a lawsuit against the company for the money.

“We cannot attract and retain the best and the brightest talent to lead and staff the A.I.G. businesses — which are now being operated principally on behalf of American taxpayers — if employees believe their compensation is subject to continued and arbitrary adjustment by the U.S. Treasury,” AIG CEO Edward M. Liddy said in a letter addressed to Treasury Secretary Timothy F. Geithner on Saturday.

Liddy said that he asked Geithner “to use that leverage and pursue every legal avenue to block these bonuses and make the American taxpayers whole.”

“I want everybody to be clear that Secretary Geithner’s been on the case,” Obama said. “He’s working to resolve this matter with the new CEO, Edward Liddy, who, by the way, everybody needs to understand, came on board after the contracts that led to these bonuses were agreed to last year.”

If the bonuses cannot be stopped, the U.S. Congress says they want AIG to reimburse the government. Congress is looking to impose stiff new taxes on the pay, or ordering the company to return the money which was originally granted from a government bailout. In a letter to House Speaker Nancy Pelosi on Tuesday, senator Richard Shelby promised that the treasury will recover all of the money. Several U.S. senators along with Liddy have sent letters to AIG asking for the bonuses to be renegotiated, something AIG agreed to and says they will reduce future bonuses by 30%. Senators state that if Libby does not respond by renegotiating the bonuses, the Senate Finance Committee will propose an excise tax. Not only will an excise tax be proposed on AIG, but all companies receiving bailout money and their employees who receive bonuses.

What is the highest excise tax we can impose that will stand up in court? Let’s find out.

Numerous House Democrats have introduced legislation which would place a 100% tax on any bonuses of over $100,000 from companies that are receiving government bailout funds. Meanwhile in the Senate, a bipartisan proposal by Max Baucus (D-Montana) and Charles Grassley (R-Iowa) would levy a special 90% excise tax on AIG’s bonuses. Asked Senator Baucus, who chairs the Senate Finance Committee: “What is the highest excise tax we can impose that will stand up in court? Let’s find out.”

Retrieved from “https://en.wikinews.org/w/index.php?title=US_president_Obama,_Congress_call_for_blocking_of_executive_bonuses_at_AIG_insurance_company&oldid=4493828”

Buffalo, N.Y. hotel proposal threatened by possible lawsuit

Thursday, March 16, 2006

Buffalo, New York — The property at 605 Forest in Buffalo was the center of attention at last night’s public meeting held at the offices of Forever Elmwood on Elmwood Avenue in Buffalo. Eva Hassett, Vice President of Savarino Construction Services Corporation, confirmed last night that the company will be seeking a variance for the 605 Forest property. Originally, both the 605 and 607 Forest Avenue properties were going to have variances placed on them. As it stands, 607 Forest will not be directly affected by the proposal, should it go forward. Both 605 and 607 are currently occupied by residents.

During Monday night’s meeting, Pano Georgiadis, owner of 605 Forest and owner of Pano’s Resuraunt at 1081 Elmwood Avenue in Buffalo, threatened to “sue” Savarino Construction if they tried to obtain a variance on his property to build the Elmwood Village Hotel.

The Elmwood Village Hotel is a proposal by Savarino Construction that would be placed on the corner of Forest and Elmwood in Buffalo. In order for the project to move forward, at least five buildings (1119-1121 Elmwood) which include both residences and businesses will have to be demolished. The hotel was designed by architect Karl Frizlen of the Frizlen Group. Although the properties are “under contract,” according to Hassett, it is unclear whether Savarino Construction owns the properties. Hans Mobius, a resident of Clarence, New York and former Buffalo Mayoral candidate, is still believed to own them.

Currently, none of the properties is zoned for a hotel.

A freelance journalist writing for Wikinews asked Hassett what kind of zoning permit they [Savarino] would be applying for and, if 605 Forest is included, what zone that would be.

Buffalo, N.Y. Hotel Proposal Controversy
Recent Developments
  • “Old deeds threaten Buffalo, NY hotel development” — Wikinews, November 21, 2006
  • “Proposal for Buffalo, N.Y. hotel reportedly dead: parcels for sale “by owner”” — Wikinews, November 16, 2006
  • “Contract to buy properties on site of Buffalo, N.Y. hotel proposal extended” — Wikinews, October 2, 2006
  • “Court date “as needed” for lawsuit against Buffalo, N.Y. hotel proposal” — Wikinews, August 14, 2006
  • “Preliminary hearing for lawsuit against Buffalo, N.Y. hotel proposal rescheduled” — Wikinews, July 26, 2006
  • “Elmwood Village Hotel proposal in Buffalo, N.Y. withdrawn” — Wikinews, July 13, 2006
  • “Preliminary hearing against Buffalo, N.Y. hotel proposal delayed” — Wikinews, June 2, 2006
Original Story
  • “Hotel development proposal could displace Buffalo, NY business owners” — Wikinews, February 17, 2006

“There is a ‘special development plan’ in front of the council, which changes only one thing about the zoning. It allows one permitted use for just a hotel. The rest of the zoning remains as it is under the current Elmwood Business District zoning. 605 and 607 Forest are not required for the project. They are not part of the footprint for the project. Let me answer this question again. This is on the record, in council: 605 needs to be rezoned in order to facilitate the project because of the sideyard requirement. Anything in C-2 is excluded besides the hotel. So we’ve taken the C-2 and included the hotel as a permitted use, and excluded everything else and everything else remains the same.”

However, during the February 28 Common Council meeting, Hassett was quoted as saying that the two properties were “off the agenda.”

“Now Karl said, at the last meeting, that they will build this hotel right on the borderline [property line]. If a wall forty-five to fifty feet high goes next to this house, of course it’s not right. You really have to go with whatever the city code says, so you have to get back as many feet as the city code says,” said Georgiadis.

“If you try to get a variance to change the code, I will sue you. This is my home, number one,” added Georgiadis. “First of all I think we are all wasting our time here, you [Savarino], have already made up your mind, but if you go against city code, and you try to do the most rooms with a minimal amount of parking, again, I will sue you. If you build a hotel, in my idea its going to fail. It’s doomed, ok. [If] it’s going to be a home for the disabled, for the homeless, for recovery people, but that’s another story. Then how is it going to be when we say, well I told you so? You will be over and done with. Its very hard to take a four story building [hotel] down.”

Georgiadis stated last night that he was against the proposal and signed a petition to stop it, jokingly saying, “this isn’t a paper to sign to build the hotel, is it? Don’t make me sign the wrong thing.”

Joseph Golombeck, district councilman, was at Monday’s public meeting and said, “we also did request this and the reason we are doing this as a special business district is so that it has to be this specific plan. They [Savarino] can’t go halfway through it and in six months decide that [the hotel] it’s going to be three floors. They can’t decide it’s going to be five floors. It has to be, per law, exactly what it is that they brought to us [the public] so far, and then ultimately to the City of Buffalo Common Council when it’s approved. So if it gets approved, it has to be this specific, exact project. They couldn’t make it fifty parking spots, they couldn’t make it thirty. It has to be specifically what they have right here.”

A man who lives on Granger Street in Buffalo attended the meeting, speaking in favor of the hotel development. He claimed, “There are a lot of low property values. Hopefully if we embrace development, our property values, for those of us who have property, will go up. There are a lot of people unfortunately, who are working hard, that do not get a chance to come to these meetings. I myself was at work and wasn’t able to go to the last two meetings. I express that we appreciate that you [Savarino] invest in the City of Buffalo and for what you hope, because I do not think Savarino is into losing money. These people are not in business to be losing money here. They are hoping for the success of this [the hotel] more than any one of us. They are hoping that the property values in this area will go up more than any one of us, because it will benefit them [the residents and business owners], more than any one of us. I want this city to develop. I don’t think anybody else is here understanding that we’re looking for development in this city, we are looking for the city to get better. The councilman here is not interested in Buffalo failing.”

Evelyn Bencinich, resident of Granger Street, would have the hotel directly behind her home, if it were to be built.

“What about construction [time]? Is that just for the exterior, the nine months? Or does that include the interior? Is there going to be blasting through bedrock? Is there property protection for damage? Are you [Savarino and the Frizlen Group] responsible?”, asked Bencinich.

According to Frizlen, there is a layer of solid bedrock at least 30 feet from the surface of the land saying, “we anticipate that the bedrock is at least thirty feet down.” He also admitted that “we haven’t done any soil sporrings,” but did say “the bedrock is somewhere in between twenty-five and thirty feet [down], we don’t need to go that deep. So blasting is most likely out of it [the question].”

“Personally, I can only speak from the city side, but a few years ago we rebuilt Vulcan Street, in the northwest corner of Buffalo, and there were a couple of properties that were damaged and they [the owners] were able to file a claim against the company that did the work and they won in each case. It was the same thing with a school that was built on Military Road. There were a couple of problems with foundations on a couple of properties, and they weren’t sure if caused by the school or not, but the insurance company ended up paying them,” answered Golombeck.

“I would assume that Savarino is insured with someone. So if there is a problem with anything that happens to your properties, what I would recommend is that anybody that lives on Granger Place, if this does go through, that you get pictures taken of your basement and of your foundations, because God forbid if there is a problem, you want to have an[sic] before and after [picture]. You don’t want to come afterwards and there’s a crack in there [foundation] and you have no way of proving that it happened,” added Golombeck.

According to Golombeck, the properties that Mobius owns have been “in housing court on several occasions, but has a date of April 11, 2006 that he is going back [to court] for these properties. So it is in housing court and I wouldn’t know Mr. Mobius if he walked in this room right now,” stated Golombeck.

“I’ve gone after him on numerous occasions and everytime he gets out of housing court with a slap on the wrist. If I am a conspiracy theorist and say that there is a lot more going on than meets the eye. I can only get him into housing court. Once he’s in housing court, the judge rules on it. Now I don’t mean to take any shots at previous administrations, but I am hoping with the new administration, being in here, that the inspections department is going to be a much better department than it has been for the previous several years.”

The city’s Planning Board on March 14, 2006, agreed to send the Elmwood Village Hotel proposal back to the Common Council so that it may “be opened back up to discussion from the public.”

On March 2, 2006 the Common Council sent the proposal “to committee” for further discussion and also requesting that the public be “engaged further.”

During that meeting, Justin Azzeralla, Executive Director for Forwever Elmwood, said that the organization “supports the hotel project.”

Also on March 2, the planning board agreed to table, or postpone, any decision on the hotel proposal for at least thirty days, also citing the need for the public to be “more engaged.”

The Common Council is expected to meet on March 21, 2006 at 2:00pm local time where they may approve or deny the proposal.

According to The Buffalo News, at least six Common Council members support the hotel project and are pledging to vote to approve it at the meeting on Tuesday, March 21.

However, the city’s Planning Board will get the final say on the project.

Retrieved from “https://en.wikinews.org/w/index.php?title=Buffalo,_N.Y._hotel_proposal_threatened_by_possible_lawsuit&oldid=1981814”

The Benefits Of Routine Maintenance By Rhode Island Air Conditioning Contractors

byadmin

One of the most expensive and necessary parts of your home is the HVAC system, which makes it possible to keep your home comfortable no matter what type of weather is outside. Many people fail to have their unit properly maintenance due to the desire to save money but trying to cut corners with your HVAC unit will only be more costly in the future when it breaks down. Instead of avoiding routine maintenance, you should view it as an investment in your HVAC unit and its health. Here are a few of the many benefits of regular maintenance by Rhode island air conditioning.

Healthier Environment

Many people fail to realize that a poorly maintenanced HVAC unit can lead to a reduction in the quality of air inside of their home. Most studies have shown that an HVAC unit that is not maintenance regularly has up to 3 times the dirt in the air than the outside does. This can lead to numerous sinus and respiratory problems that can be very detrimental to your health. The dirty air can lead to long term problems with your lungs that can be avoided by properly maintenancing your unit with the help of a professional technician.

Longer Lifespan

Another very important benefit that regular maintenance by Rhode Island Air Conditioning Contractors can bring is a longer life for your HVAC unit. By having the unit looked at every year, you will be able to catch problems before they get worse and lead to lengthy and expensive repairs. Also regular maintenance will help to extend the life of your unit, which can help save you a lot of money. By letting your unit fall into disrepair, you will be at risk of having to replace the whole unit, which can cost thousands of dollars in repairs.

If you find yourself in need of hvac repair, then look no further than Restivo’s Heating and Air Conditioning. They have over 80 years of experience in the industry which they can bring to your repair and maintenance.

George Mason University upsets UConn, advances to Final Four

Monday, March 27, 2006

The George Mason University Patriots of the Colonial Athletic Association (CAA) defeated the University of Connecticut Huskies today in overtime, 86-84.

GMU becomes the first team from the CAA to reach the Final Four in a NCAA Division I basketball championship, and only the second 11th seed (LSU was the other in 1986). The Huskies were the number one seed in the Washington Region. GMU is also the first true mid-major to reach the Final Four since 1979 with Penn State and Indiana State.

This year held the Patriots’ first NCAA Tournament game victory, where they beat Michigan State (No. 6 seed) and the University of North Carolina (No. 3 seed) in the first two rounds. They defeated Wichita State in the third round, setting up today’s match against UConn.

Although GMU lost to the University of North Carolina – Wilmington in the CAA Championship bid, the NCAA selection committee awarded the team an at-large bid. This drew criticism from sports commentators such as Billy Packer, who felt it was more appropriate to give at-large bids to schools from major conferences, like the Big East, Big 10, or ACC. Packer argued that the tougher schedules during the regular season in those conferences gave more legitimacy to teams in those leagues.

Retrieved from “https://en.wikinews.org/w/index.php?title=George_Mason_University_upsets_UConn,_advances_to_Final_Four&oldid=565135”

Cyprus charges five over 2005 air crash that killed 121

Tuesday, December 23, 2008

Cypriot prosecutors have charged five people over the 2005 crash of Helios Airways Flight 522. The loss of the Boeing 737 killed all 121 people on board in what was the deadliest air disaster for both Greece and Cyprus.

“The charge sheet was submitted to the court [in Nicosia] today [Tuesday], and a response to the charges has been set for February 26,” said deputy attorney general Akis Papasavvas. The names of those charged were not released, and they face charges of manslaughter and causing death by a reckless, thoughtless or dangerous act, which carry life and four year terms respectively. They all worked for Helios.

“The charges concern two of the three most serious offences under the Cyprus penal code,” said Papasavvas. Families of the victims, who had already called for criminal prosecutions, are still carrying out a civil action against the Cypriot civil aviation authority and airframer Boeing. Helios closed in 2006, having been renamed Ajet Airways.

The unresponsive aircraft, supposed to be flying between Lanarca to Prague, entered Greek airspace, where it was intercepted by two F-16 fighter jets on August 14, 2005.

The F-16 pilots reported the airliner’s pilots were slumped over the controls. After flying on autopilot for two hours the aircraft crashed near Athens despite the efforts of a flight attendant, who was training to become a pilot, to take control and save the jet.

The subsequent investigation discovered that the pilots failed to adequately monitor the pressurisation system. The plane lost cabin pressure and hypoxia caused the incapacitation of the passengers and flight crew. It is thought that the conscious flight attendant had used multiple crew oxygen cylinders to outlast the others on board. Investigators also believe that the equipment had been left in the wrong setting after testing by maintenance engineers and never checked before flight.

After failing to resuscitate the pilot-in-command, the trainee pilot turned off the autopilot and attempted an emergency landing at Athens International Airport, which the aircraft had been circling in a holding pattern awaiting human input. However, the aircraft ran out of fuel before reaching the runway.

Retrieved from “https://en.wikinews.org/w/index.php?title=Cyprus_charges_five_over_2005_air_crash_that_killed_121&oldid=3107770”